Question

Due to typically having lower costs, this method is more often used than a newer one which drops the middle phase. For 10 points each:
[10h] Name this most common delivery method for planning and implementing construction projects. This method’s name consists of its three distinct phases.
ANSWER: design-bid-build [accept D/B/B]
[10m] The bidding process is completed by a party known by this term, who is then responsible for implementing the construction plan and hiring out other workers for specific tasks.
ANSWER: general contractor
[10e] Though the bidding process is typically based on cost, project owners may also consider the environmental impact and sustainability of the design, involving a branch of engineering described by this adjective.
ANSWER: green engineering
<TR>

Back to bonuses

Summary

2023 BHSU @ Berkeley03/18/2023Y313.3367%67%0%
2023 BHSU @ Maryland03/11/2023Y313.3367%67%0%
2023 BHSU @ Northwestern02/25/2023Y616.6783%83%0%
2023 BHSU @ Sheffield04/15/2023Y215.0050%100%0%
2023 BHSU @ Waterloo04/15/2023Y313.3333%100%0%
2023 BHSU @ Yale04/08/2023Y316.6767%100%0%

Data

Broken Imperial NomadsBuzzers Karamazov010010
Magisters LudiOxford Hornets0101020