Question

Note to players: Description acceptable. One technology for this purpose has an “advanced adiabatic” variant that has yet to achieve viability. Various devices that serve this purpose can be compared using a Ragone plot. One type of device used for this purpose relies on the formation of a double layer on two coatings of activated carbon and is called an EDLC. Another system for this purpose uses magnetic bearings to levitate a (*) flywheel. Round-trip efficiencies between 70-80% are achieved by “pumped” systems for this purpose, (10[1]-5[1])which hold water at two different elevations to deal with load fluctuations. (10[2])Technologies for this purpose are needed because, for many renewables, peak demand (10[2])and peak production occur at different times. For 10 points, name this process performed by hooking up a power plant to a grid of rechargeable batteries. ■END■ (10[1])

ANSWER: energy storage [accept answers indicating that energy or power or electricity or charge is being stored or saved for later use; accept grid energy storage or advanced adiabatic compressed air energy storage or flywheel energy storage or pumped hydroelectric storage; accept load balancing or load matching before “load”; prompt on load balancing or load matching after “load”; prompt on charging a battery or supercapacitor]
<BB>
= Average correct buzz position

Back to tossups

Buzzes

PlayerTeamOpponentBuzz PositionValue
Jerry VinokurovBrownstein et al.Northwestern84-5
Ashvin SrivatsaEpicPurdue8410
Conor ThompsonMichiganAmartya Senpai Notice Me9610
Taylor HarveyMojo ShojoWUSTL9610
Adam FineChicago AIllinois10810
Vivek SasseChicago B+OSU10810
Andrew SalijNorthwesternBrownstein et al.13510

Summary

2023 BHSU @ Northwestern02/25/2023Y6100%0%17%104.50
2023 BHSU @ Maryland03/11/2023Y3100%0%33%115.33
2023 BHSU @ Berkeley03/18/2023Y3100%33%67%103.67
2023 BHSU @ Yale04/08/2023Y3100%33%33%87.00
2023 BHSU @ Yale04/08/2023Y3100%0%33%119.33
2023 BHSU @ Waterloo04/15/2023Y3100%0%33%115.00
2023 BHSU Online04/15/2023Y4100%50%0%78.50
2023 BHSU @ Sheffield04/15/2023Y2100%0%50%124.50